1.由安裝施工方與建設(shè)單位、供貨單位共同對液壓升降平臺以及零部件進行清點交接。By the installation of the construction side and the construction unit, the supply unit of hydraulic lifting platform and parts of the inventory handover.
2.經(jīng)過吊裝運輸?shù)浆F(xiàn)場,液壓升降平臺設(shè)備的開箱檢查和保管。After lifting the transport to the site, the hydraulic lifting platform of equipment inspection and keep out of the box.
3.設(shè)備基礎(chǔ)。設(shè)備基礎(chǔ)是否達到基礎(chǔ)要求的位置,液壓升降平臺安裝施工與土建施工交接。Equipment foundation. Whether the equipment foundation meets the basic requirements, the installation of the hydraulic lifting platform is connected with the civil construction.
4.起重、測量、切割、焊接等液壓升降平臺工具設(shè)備組織準(zhǔn)備。Preparation of lifting, measuring, cutting, welding and other hydraulic lifting platform equipment.
5.正式安裝錢準(zhǔn)備過程中首先必須準(zhǔn)備好技術(shù)施工方案。只有根據(jù)實際情況做好充分計劃,尤其是大型液壓升降平臺的安裝施工,更要詳細(xì)做好施工方案才能保證客戶要求。The formal installation of money preparation process must first be ready for technical construction program. Only in accordance with the actual situation to do a good job, especially the large-scale hydraulic lifting platform installation construction, but also to do a good job in detail to ensure that the construction of customer requirements.