熱門關(guān)鍵詞: 液壓升降平臺(tái) 導(dǎo)軌式升降機(jī) 移動(dòng)式升降平臺(tái) 固定式升降機(jī) 鋁合金升降平臺(tái)
1、新的或長(zhǎng)期停用的的電機(jī),使用前應(yīng)檢查繞組間和繞組對(duì)地絕緣電阻,并應(yīng)在電機(jī)冷卻狀態(tài)下測(cè)量。
Should be checked before new or long-term disabled motor Hangzhou lifting platform, using inter-winding and winding insulation resistance, and should be measured at the motor cooling state.
2、檢查廠房升降平臺(tái)的電機(jī)的外表有無裂紋,各緊固螺釘及零件是否齊全,電機(jī)的固定情況是否良好及電機(jī)傳動(dòng)機(jī)構(gòu)的工作是否可靠。
Check the appearance of the motor plant in Hangzhou lifting platform for cracks, the fastening screws and parts are complete, fixed the motor is good and the motor drive mechanism work is reliable.
3、根據(jù)銘牌所示數(shù)據(jù),如電壓、功率、頻率、聯(lián)結(jié)、轉(zhuǎn)速等與電源、負(fù)載比較是否相符,升降平臺(tái)電機(jī)的通風(fēng)情況及軸承潤(rùn)滑情況是否正常。
According to the data shown in the nameplate, such as voltage, power, frequency, link, speed and power, such as the load is relatively consistent, ventilation and bearing lubrication Hangzhou lifting platform motor is normal.
4、扳動(dòng)廠房升降平臺(tái)電機(jī)轉(zhuǎn)軸,檢查轉(zhuǎn)子能否自由轉(zhuǎn)動(dòng),舉刷機(jī)構(gòu)是否靈活,舉刷手柄的位置是否正確及電機(jī)接地裝置是否可靠。
Hangzhou plant lifting platform pulled the motor shaft and check the rotor can rotate freely, move the brush mechanism is flexible, move the brush handle is correctly positioned and electrical grounding device is reliable.